Woot. I've officially reached the four-minute mark on filming, which means that I'm 20% through with filming if the footage is actually going to end up being 20 minutes long, but I'm thinking it will probably be a little shorter than that but closer to 20 minutes total with credits and whatnot. I got a second or so done last night with another 3 seconds done tonight, all of which were fairly hard to film since I had to film Darn ducking behind a trash can, which is not easy! So the animation suffered a little bit, but at the same time I was able to get some cool headlight effects with my LED booklight.
I finally got my forest set up with some model trees (made for model trains) I bought at Hobby Lobby (for $30! Rrrr.) So that problem is now taken care of and I can start filming that whole sequence, which probably accounts for the next three or four minutes of the film. A lot is dialogue, so I should be able to film that quicker than the rest of the stuff I've been doing. Hopefully. The next scene up is where Darn meets Minono (graciously played by Sméagol) and then goes into the tree, hopefully not to be shot by the Anti-Smoker Society agents! We'll see. And I still need to take those pictures of the various vehicles and post those.
Also, I'm heading off to my orchestra camp Sunday and will be gone the following two weeks, so don't be expecting any updates during that time, at least not ones about filming. Although I do have telekinetic powers. I just don't like to use them.
PROJECTED LENGTH: 20:00
LENGTH FILMED: 4:01
PERCENTAGE OF PROJECTED LENGTH FILMED: 20%
PERCENTAGE OF SCRIPT FILMED: 24%
Thursday, July 10, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment